A school building in West Africa answers different questions than a school in Istanbul or Ankara. The volume of water running off the roof in the rainy season is high, classrooms must stay cool in hot and humid weather, and air conditioning cannot be relied on during power cuts. For this reason, the first questions in a good school project concern the climate: which direction the windows will face, how far the eaves will extend, and whether air will be able to pass through opposing windows.
The company works from its Africa office in Conakry, Guinea. Its educational buildings portfolio includes the Zarifa Aliyeva School in Baku, Bilfen College and Toprak Primary School in Istanbul, Sonoco University in Conakry, and the 2024 [Conakry School Campus](/tr/projeler/okul-kampusu/).
The Conakry School Campus was completed in 2024. The project was conceived as a campus with a sports field, classrooms, administrative units and social areas. This is an important point for a contractor building schools in Africa: having materials arrive on site on time and at the specified quality is one of the issues that most affects the schedule.
Reinforced concrete. It is the long-lasting solution for multi-classroom middle and high school buildings. The column-beam system and infill walls can be built with local labor. Reinforced concrete mass retains heat during the day and releases it slowly; in hot regions, this should be considered together with well-designed shading.
Steel and panel. It is used where delivery time must be kept short or where an urgent need for education arises. The components are prepared in the factory and assembled quickly on site. The choice of thermal insulation in roof and wall panels directly affects how cool the building stays.
Hybrid solution. The administrative building can be reinforced concrete and the classroom blocks can be built with a panel system. It is used in mid-sized campuses where a balance of budget and time is needed; the blocks can be delivered in phases.
Which system is chosen is determined by the number of students, the delivery date, the budget and local labor conditions. There is no single right answer. For a comparison of the two structural systems in terms of span, time, cost and climate, see the "Reinforced Concrete or Steel" article on the [guides](/tr/rehberler/) page.
• Classroom size: Determined by the number of students and the education ministry standards of the country.
• Roof: Sufficient slope for heavy rainfall, wide eaves, thermal insulation and rainwater harvesting.
• Ventilation: Natural airflow through opposing windows. Orientation so that direct sunlight does not enter the classroom.
• Foundation: Isolated, strip or raft foundation depending on the soil survey. In rainy regions, drainage is considered separately.
• Water and sanitation infrastructure: Toilets suited to the number of students, a clean water tank and a wastewater solution.
• Safety: Escape routes, wide corridors and outward-opening doors.
• Floor and wall finishes: Surfaces that withstand heavy use, are easy to clean and are not affected by moisture are chosen.
The exact dimensions and material list become clear after the country's building regulations and the soil survey. Working out cost from general figures is misleading.
In West Africa, the site calendar is built around the rainy season. Excavation, foundation and roof works are scheduled for the dry season where possible. In heavy rain, reinforced concrete pouring, earthworks and road access can become problematic. A good work schedule leaves allowance for these months and places finishing works and items that can be carried out indoors in the rainy period.
Transporting materials from the port to the site is also affected by the season. The "Doing Construction Business in West Africa" guide, which explains the differences of carrying out construction work in the region, scheduling around the rainfall regime and the customs process, is also on the [guides](/tr/rehberler/) page.
A school is not only classrooms. A canteen, sports field, library, administrative building and, where needed, a dormitory building are parts of the same campus. The location of these buildings determines student flow. If the sports field is away from the main block but within line of sight, a balance is achieved in terms of safety and noise. If the canteen and toilet blocks are located close to the drinking water and wastewater lines, installation costs fall. The Conakry School Campus is an example that plans the sports field, classrooms and administrative units together.
Phased delivery is also useful in campus projects: first the classroom block and toilets are delivered and teaching begins, then the sports and social areas are completed. This approach gives the client flexibility in projects where financing is spread over periods.
The building scale, structural system and rainy season determine the duration. A panel system can be faster than reinforced concrete. The exact duration can be stated after the site survey.
Basic building materials are often sourced locally, while products of inconsistent quality or that are unavailable are imported. The decision is made by comparing logistics and cost.
Yes. The classroom and toilet blocks can be delivered first and teaching can begin, with the sports and social areas completed later. This should be stated in the contract from the outset.
For your project in West Africa, you can reach our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr
For your project in West Africa, contact our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr