Construction Contracting Services

2026-11-28

Construction contracting means entrusting the construction of a structure to a contractor within a scope, price and time frame set by contract. The investor describes what is wanted through specifications and drawings; the contractor takes on materials, labor, equipment and site organization, and delivers the structure. In this way, instead of dealing separately with dozens of subcontractors, the investor works with a single responsible party.

How Work Is Shared in a Contracting Agreement

The scope is not the same in every job. In some contracts the contractor carries out only the construction, and the investor supplies the design. In others, design, permit procedures, construction and acceptance procedures are given to the contractor as a single package. Stating clearly in the first pages of the contract who is responsible for which work prevents most of the scope disputes that might arise later.

The company has completed residential, hotel, public, educational and industrial buildings in Türkiye, Azerbaijan, Guinea and Sierra Leone. You can see the company's completed works on the [Projects](/tr/projeler/) page.

Four Contract Types and Their Effect on the Budget

Lump sum. The total price is fixed when the contract is signed. If the design and specifications are complete, it is the most predictable model for the investor. If the investor requests a change during construction, the price difference is calculated separately.

Unit price. Work items are tied to the contract with unit prices, and payment is made by measuring the quantities actually completed. This model is used when ground conditions or design details are not clear from the outset. The total price becomes known only when the work is finished, so quantity checks must be carried out regularly.

Turnkey. Design, materials, construction and handover are the contractor's responsibility. The investor provides the land and the list of requirements, and the building is delivered ready for use. It is frequently preferred in overseas investments managed remotely.

Build-operate-transfer. The contractor finances the structure, operates it for a set period, and then transfers it to the relevant authority. It is seen mostly in public infrastructure and large facilities; the financing and operation plan is an integral part of the contract.

The File That Must Be Ready Before Entering the Contract

The contract price can be calculated reliably only if sufficient technical documents are available. At the bidding stage, the following are generally required:

• Architectural, structural, mechanical and electrical construction drawings

• Room schedule and material specifications

• Work program and progress payment schedule

• Administrative specifications describing acceptance and handover conditions

The geotechnical survey is the document that is often skipped but that changes the price the most. The foundation system, excavation volume and retaining wall requirements depend on it. In overseas projects, the contract should also state in which language the documents will be prepared, which country's building regulations will apply, and which unit of measurement will be used.

Progress Payments, Acceptance and the Warranty Period

Payments are mostly made through monthly or stage-based progress payments. The contractor reports the work completed, the investor or the supervising engineer appointed by the investor approves the measurement, and the payment is issued based on that approval. The rates of advance payment, retention deduction and delay penalty should be written in the contract as figures.

Handover takes place in two steps. At provisional acceptance, the building is taken into use and a snag list is drawn up. After the defects are remedied, final acceptance is carried out and the retention is returned. Construction defects that appear during the warranty period in between are corrected by the contractor. The length of these periods is set in the contract according to the type of work and the country.

Contracting Abroad: Realities on Site

In overseas projects, logistics determines the budget as much as technical calculations do. Which materials will be sourced locally and which imported, how they will be transported from the port to the site, and for which tasks local labor will be used are all planned from the start. The rainy season, customs processing times and permit procedures are written into the work program with allowance left for them.

Because the same company also exports building materials, material supply for projects can be planned through its own network. [Niger Tower](/tr/projeler/niger-tower/) and the [Conakry School Campus](/tr/projeler/okul-kampusu/) in Conakry are examples of this approach.

In Which Building Types Is Contracting Used

The contracting model is independent of building type. It is applied in housing and villa projects, hotels, offices and mixed-use buildings, public buildings such as schools and police stations, and industrial buildings such as factories and warehouses. The company has completed projects in nearly all of these building types; for example, it has taken part in works such as the [Etimesgut Police Station](/tr/projeler/etimesgut-emniyet/) in Ankara and Flame Towers in Baku.

Should You Choose Lump Sum or Unit Price?

If the design and specifications are complete, a lump sum fixes the budget. If the scope or ground conditions are uncertain, unit pricing provides a fairer measurement. The choice depends on how well defined the project is.

What Does the Investor Provide in Turnkey Contracting?

Generally, the investor provides the land, the list of requirements and the budget framework. Design, materials, construction and handover remain with the contractor.

How Does the Investor Monitor the Construction Process?

Through progress payment periods, site reports and progress meetings. In overseas projects, appointing an independent supervising engineer is a frequently used method.

What Information Is Needed for a Quote?

Land details, the intended use of the building, the approximate construction area, design drawings if available and the target schedule are sufficient for an initial assessment.

For your project in West Africa, you can reach our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr

For your project in West Africa, contact our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr

Related guides

Cookie Notice

Our website uses essential cookies to work properly; analytics cookies for visit statistics are only enabled with your consent. Details: Cookie Policy