Unlike a residential building, an office building is a structure whose user will change its layout over decades. A floor planned as open office today may be divided into meeting rooms five years from now. For this reason, the real question in a good office project is not "how many square meters" but "how flexible can the floor plan remain". Column spacing, core location, service shafts and floor load determine this flexibility.

In an Office Building, Decisions Begin Before the Plan

The [Maidan Office Project](/tr/projeler/maidan-ofis/) in Ankara and the [Niger Tower](/tr/projeler/niger-tower/) in Conakry are examples of this type of work.

Structural System: Reinforced Concrete, Steel or Composite

Reinforced concrete. Reinforced concrete with a column-beam or shear wall system is advantageous in terms of fire resistance and sound insulation. Its material is available locally in most regions, and labor experience is widespread. Column spans are narrower than with steel.

Steel. It is used in structures that require wide spans and fast erection. Elements are manufactured in the factory and assembled on site. The need for protective fire coating adds to the cost.

Composite. A reinforced concrete core is used together with steel or composite floors. It is preferred in high-rise buildings because it provides both rigidity and speed.

Prefabricated. Modular elements are used for temporary offices or office needs requiring short delivery times. Site time is reduced, but architectural flexibility is limited.

Price alone does not determine the choice. Ground conditions, delivery date, local labor and the time it takes for materials to reach the site are evaluated together.

Parameters Measured on an Office Floor

In an office building, technical parameters are selected differently from a residential building:

• Floor height: Since ventilation ducts, cables and sprinklers pass above the suspended ceiling, the gross floor height is kept higher than in residential buildings.

• Column spacing: If a free plan is desired, wide spacing is chosen; this affects beam depth and cost.

• Core: If elevators, stairs and wet areas are gathered in a single core, the leasable area increases.

• Façade: Glazing ratio, solar control and thermal insulation are determined according to the climate. In hot climates, a glass façade increases the cooling load.

• Fire safety: Escape distance, escape stairs, fire doors and the detection system are designed in accordance with the applicable regulations.

• Foundation: A raft or piled foundation is selected according to the soil survey.

Abroad, earthquake, wind and fire loads are taken according to the regulations of the country where the project is built. A site survey and an engineering report are required for these values; office costs should not be calculated using general figures.

A Corporate Headquarters Is Not the Same as a Public Service Building

In corporate headquarters, meeting rooms, shared work areas and the reception lobby drive the plan. In public service buildings, the citizen reception area, archive and security checkpoint are decisive. The same structural system can translate into very different plan decisions in two different uses.

Additional Cost Items of Building an Office Abroad

When building an office abroad, site setup affects the budget as much as the building itself. The site office, worker accommodation, energy source, water supply and transport from the port to the site must be calculated from the start. Products such as the façade system and elevators are often imported; order and delivery times must be written into the work schedule.

Since the company also exports building materials, part of the project materials can be planned from its own supply network.

How the Schedule Is Built

Office building construction roughly proceeds in this order: site survey and design, foundation and basement, structural system, façade and roof, mechanical-electrical installations, finishing works, testing and handover. If façade and installation works overlap with the structural system, the duration is shortened; however, this requires tight coordination. The duration varies according to the building system and size, and can only be stated realistically after the site survey.

Should reinforced concrete or steel be preferred?

Reinforced concrete is comfortable in terms of fire and sound, and its material is available in most places. Steel is fast and provides wide spans. Delivery date, budget and local material availability determine the choice.

Why is floor height kept high in an office building?

Air-conditioning ducts, cables and fire-extinguishing pipes pass above the suspended ceiling. If this volume is not left, the net ceiling height decreases.

How is compliance with local regulations ensured abroad?

At the start of the project, the country's building regulations are reviewed, calculations are prepared accordingly, and, when necessary, work is done with a local design professional.

What information is needed for a quote?

Plot information, approximate construction area, number of floors, the architectural design if available, and the target delivery date are sufficient for an initial assessment.

For your project in West Africa, you can reach our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr

For your project in West Africa, contact our Ankara head office (+90 312 544 00 09) or our Africa office in Conakry (Plaza Platinium No 404, Kipe, Ratoma — +224 629 393 071): info@koprululer.com.tr

Related guides

Cookie Notice

Our website uses essential cookies to work properly; analytics cookies for visit statistics are only enabled with your consent. Details: Cookie Policy